1807 - Shield 5 Program Project - Asphalt Works
Excavation & Crushing Company
July 27, 2018
Asphalt works

1803 - Shield 5 Program Project - Asphalt Works
Excavation & Crushing Company
July 27, 2018
Asphalt works

1802 - Shamal Nursery - External Road Construction Project
Client: Nakheel Landscape
March 17, 2018
Road Works Including Earthworks, Excavation, Filling, Sub-base and Asphalt, Traffic Signs & Markings, Storm Water Drainage

1801 - Design & Build of Restaurants at Al Bayt Stadium in Al Khor
Client : Aspire Zone
February 28, 2018
Design and Build of Tent Restaurants & Lake Restaurant Complete with Structures, Civil Works, Including External Finishes

1725 - Supply & Lay Asphalt at Al Jazeera Channel Site
Sahayeb Trading
December 14, 2017
Supply and Lay of Asphalt with Spraying of Tack Coat and Prime Coat

1724 - Link Road & Infrastructure to Salwa Beach Resort (QS042)
Client: Ashghal
November 27, 2017
Asphalt Works, Landscaping, TSE Network, Street Lighting'Road Markings, Traffic Signs, Utility Services (KM & Ooredoo)

1722 - Infrastructure FS Gaps for Bani Hajer & Rayyan Stadium, Foul Sewer Package I (DN117-P01)
Client: Ashghal
November 18, 2017
Installation of trunk sewer line with various pipe diameters using microtunnelling techniques, Installation of shallow sewer lines with various pipe dia using open cut method, Traffic Maintenance, Interfacing with adjacent contractors

1720 - Infrastructure FS Gaps for Bani Hajer - Package III (DN107-P03)
Client: Ashghal
November 18, 2017
Construction of Foul Sewer lines with various pipe dia using microtunnelling techniques, Construction of shallow sewer lines with various pipe dia using open excavation method, Traffic Maintenance, Interfacing with adjacent contractors

1719 - Doha Industrial Area Offsite Works
Client: Ashghal
November 11, 2017
Earthworks & Grading Works, Surface Water Drainage System, Main Storm Water Pumping Station, Recharge Wells, Roads, Street Lighting' Kerb Lines & Footways, Relocation & Installation of Treatment Plant, Utilities Connections

1718 - Infrastructure FS Gaps for Al Kheesa - Package II (DN116-P02)
Client: Ashghal
November 07, 2017
Microtunneling, House Connections & Construction of Shafts

1717 - Infrastructure FS Gaps for Al Kheesa - Package I (DN116-P01)
Client: Ashghal
October 08, 2017
Microtunneling, House Connections & Construction of Shafts

1715 - Roads & Infrastructure in West Al Meshaf - Package 4
Client: Ashghal
September 14, 2017
Earthworks (Fill material, Subbase, Kerbstone & Inter-Lock), Roads, Electrical, Street Lighting, Traffic Signals, MicroTunneling Drain. TSE Works, Landscaping, Traffic Signs, Road Marking & Traffic Diversions

1714 - Al Wakrah Beach (2 Beaches Renovation) - North & South
Client: Ashghal
August 26, 2017
Renovation of 2 Beaches, Construction of Cafeteria, Guard House, Toilets, Supply & Installation of Solar Lights & Parking Areas

1713 - Roads Surrounding Al Bayt Stadium
Client: Ashghal
July 31, 2017
Road Works, Completed with Kerbs, Underground Services, Street Lighting, Signalized Junctions, Safety Barriers, Pavements, Surfaces, Water Drainage Systems, ISE Transmissions, Distribution Line.

1712 - Roads & Infrastructure in Al Froos / Al Kharaitiyat - Package 01
Client: Ashghal
July 24, 2017
Demolition & Site Clearance, Road Works, Surgace Water & Foul Water Drainage, Street Lighting, Utility Services (Electricity, Water & Telecommunication) and Traffic Maintenance

1709 - Design, Build & Maintenance of Link Road Between Al Khor & Ras Mulaiji
Client: Ashghal
February 28, 2017
QAR 6.5M
Earthworks, Asphalt Works, Electrical, Street Lighting, Safety Barriers & Utilities Networks (Ooredoo & DSSS)

1708 - Roads & Infrastructure in Shamal - Package 01
Client: Ashghal
February 28, 2017
QAR 699.7M
Earthworks (Fill Material, Subbase, Kerbstone, Interlocking Tiles), Roads, Electrical, Street Lighting, Microtunneling, Foul Sewer, Traffic Signs, Road Marking & Traffic Diversion in Shamal Area, North of Qatar

1707 - Construction of East Corridor
Client: CHEC
February 28, 2017
QAR 34.7M
Asphalt Works for Construction of East Corridor P011 (Package 2)

1706 - Construction of Al Wakrah Bypass Road
Client: L&T
February 28, 2017
QAR 120.6M
Asphalt Road Works for Design & Construct AI Wakrah Bypass Road (P015)

1705 - Construction & Upgrade of Al Rayyan Road - Temporary Works
Client: Dogus
February 28, 2017
QAR 4.4M
Temporary Asphalt Works for Construction and Upgrade of Rayyan Road Project 7: Contract 2

1704 - Construction & Upgrade of Al Rayyan Road
Client: Dogus
February 28, 2017
QAR 138.9M
Permanent Asphalt Works for Construction and Upgrade of Rayyan Road Project 7: Contract 2

1701 - Suply & Placing of Colored Asphalt for Park Cycle Lane
Client: General Engineering Technologies
January 22, 2017
QAR 10.5M
Supply and Place Colored Asphalt for Park Cycle Lanes & Road Works for the New Al Bidaa Park on Corniche

1605 - Road & Infrastructure in North of Mall of Qatar & Celebration Road - Package 3 & 4
Client: Ashghal
November 15, 2015
QAR 51.6M
Grading Works, Excavation & Filling Works

1506 - Roads & Infrastructure Works in West of Al Meshaf - Package 3
Client: Ashghal
March 14, 2015
QAR 518.6M
Site Clearance, Earthworks, Flexible Surfacing, Kerbing & Footways, Traffic Signs & Road Marking, Traffic Signals, Surface Water Drainage, Water Works, Electricity Works, Q-Tel Works, Irrigation & Landscaping Works and Microtunneling Works

1414 - Maintenance & Improvement of Roads Throughout Qatar - Contract 2
Client: Ashghal
January 01, 2020
QAR 64.2M
Maintenance of Roads Throughout the State of Qatar in Over 135 Locations, Renewed Due to Client Satisfaction

1411 - New Orbital Highway - NOH2
Client: QDVC - BinOMRAN JV
January 01, 2020
QAR 1.45B
Grade-separated Interchanges, Highway Structures Including Bridges, Flyovers, Underpasses, Culverts, Retaining Walls, Pumpstations, Substations, Drainage Structures, Tanks, Gantries, Traffic Signs, Road Markings, Storm Water Drainage System, Foul Sewerage Networks, Water Supply Network, Electrical Network, Telephone Networks, Utilities Protection Works, Lansdscape, Hardscape, Irrigation Works.

1405 - Al Bayt Stadium At Al Khor
Client: Aspire Zone
January 01, 2020
QAR 688.9M
Design, Construction, Commissioning of the STP Construction of Lakes and Creek Development, Floating Tree, Water Cascade & Shear Drop Features, Construction of Culvert, Roads and Parking Areas, Road Furniture, Road Marking, Construction of Horse Track, Jogging Track & Camel Track, Design and Construction of Helipad, Practice Fields.