Supply & Lay Asphalt at Al Jazeera Channel Site

Client: SAHAYEB TRADING

December 14, 2017

Supply & Lay Asphalt with Spraying of Tack Coat & Prime Coat

Interim Upgrade of E-Ring Road & Najma Street - PWA/GTC/057

Client: Ashghal

March 14, 2017

Site Clearance, Earthworks, Flexible Surfacing, Kerbing & Footways, Traffic Signs & Road Marking, Traffic Signals, Surface Water, Drainage, Water Works, Electricity Works, Ooredoo, Irrigation & Landscaping Works

Bypass From Rawdat Rashed Village to Umm Garn - P. 02

Client: Ashghal

November 30, 2016

Site Clearance, Earthworks, Flexible Surfacing, Kerbing & Footways, Traffic Signs & Road Marking, Traffic Signals, Surface Water, Drainage, Water Works, Electricity Works, Ooredoo, Irrigation & Landscaping Works

Flow Diversion Schemes in Al Wajba & New Al Rayyan - PS 12 & PS12A

Client: Ashghal

July 31, 2016

Construction of 6.5KM Long Deep Trunk Sewer with Diameters Ranging Between 1000mm to 1400mm 400 & 600mm branches) & Depths Ranging From 5.7m to 20.3m, With the Use of Micro Tunneling Technique

Al Rayyan Stadium - Civil Works & Excavation Works

Client: Supreme Committee for Delivery & Legacy

January 31, 2016

Earth works, Infrastructure Works

Improvement on C-Ring Road Junctions & Roundabouts

Client: Ashghal

March 31, 2015

Site Clearance, Earthworks, Flexible Surfacing, Kerbing & Footways, Traffic Signs & Road Marking, Traffic Signals, Surface Water, Drainage, Water Works, Electricity Works, Ooredoo, Irrigation & Landscaping Works

Enabling Bulk Earthworks for Al Khor International Stadium

Client: Aspire Zone

January 31, 2015

Earthworks & Filling

Al-Erkyah Development Secondary Infrastructure Works

Client: Arkaz Investment Co.

December 31, 2014

Construction of Roads, Stormwater, Foul Sewer, TSE-Irrigation, Water, District Cooling, Gas, Electrical, Telecom

Construction & Maintenance of Al Huwailah Link Road

Client: Ashghal

November 30, 2014

Fencing & Safety Barriers, Earth Works, Asphalt Works, Kerbs & Footways, Water Network, Drainage and Culvert, Basin, Swale, Electrical, Street Lighting, Qtel, QAF, ITS, Irrigation, Landscaping, Traffic Signs, Road Marking & Traffic Signs

Extension of Highway 55 - Temporary Truck Route - Section C

Client: Ashghal

September 30, 2014

Construction of Sections C of Route 55 TTR, Traffic Signs, Street Lighting, all Related Infrastructure - Various New Roundabouts and All Related Cross Roads, Traffic Signs & Road Markings, Street Lighting & Bridge Lighting Works, Storm Water Drainage System, Relocation, Protection of Existing QP Lines

Earth Works for Mega Reservoirs at Umm Slal - Package 01

Client: KAHRAMAA

June 30, 2014

Preparation of the site including utilities survey, Clearing, Stripping, Demolishing & Disposal of all Debris, Excavation of Material, On-site Crushing of Excavated Material, On-site Stockpiling of Crushed Material, Off-site Disposal of Material.

Development of Roads in Bani Hajer - Zoner 51

Client: Ashghal / Burhan - ITC JV

November 30, 2013

Earth Works, Asphalt Works, Granite and Interlock Paving Works

Construction of Graveyard at Mesaimeer

Client: Ashghal / Promer Qatar

August 31, 2013

Earth Works, Sub base, Asphalt Works

Parking Facilities at Mesaimeer for Religious Complex

Client: Ashghal

August 23, 2013

Earth Works, Asphalt Works, Kerbs & Footways, Drainage, Street Lighting, Traffic Signs, Road Marking 

Peripheral Roads to Barwa City

Client: Ashghal

December 21, 2012

Drainage, Earth Works, Asphalt Works, Water Network, Electrical, Street Lighting, Qtel, Sewerage, Traffic Signs, Road Marking & Directional Signs